Now that the work on the loft is nearing completion focus has shifted to the 1st floor gallery and studio. The windows and trim are close to being completed and this week the tin ceiling was put back in place. Next will be the paint and flooring. It's amazing the difference the windows on the Innes st. side have made to the building, not only from the outside but also to the interior. The natural light that streams in illuminates the gallery in a way that I never could have imagined. I can't wait to see the display windows lined with pottery.
Friday, September 19, 2008
Subscribe to:
Posts (Atom)